FCCA (Factory Capability & Capacity Assessment) is Walmart's quality and production-capacity audit. Passing requires a disciplined quality system across seven modules, with all critical control points met and a score of at least 70%. This checklist organizes the requirements by module so your factory can self-assess before the on-site audit.

FCCA at a Glance

Requirement Detail
Pass score At least 70% overall, with all critical control points met
Rating A (90-100%, Good), B (70-89%, Acceptable), C (below 69%, Unacceptable)
Modules Seven assessment areas
Critical points All critical control points must be met; a zero on a critical question is C-Unacceptable
CAP window Completed Corrective Action Plan sent to the third party within 90 days of the audit

FCCA Compliance Checklist by Module

1. Factory Facility & Environment

  • Buildings and production areas are well maintained and suitable for the product
  • Adequate lighting, ventilation, and illumination in inspection and production areas
  • Clear product flow and segregation between raw, in-process, and finished goods
  • Clean, organized storage with materials off the floor and clearly identified

2. Quality Management System

  • Documented Quality Management System (alignment to ISO 9001 is the recognized benchmark)
  • Written quality policy and procedures available at the point of use
  • Management review meetings that track quality objectives
  • Training program for key personnel, with records

3. Incoming Material Quality Control

  • Incoming inspection (IQC) area with adequate lighting and controls
  • Supplier evaluation and approved-supplier process
  • Material identification, segregation, and traceability
  • Records of incoming inspections and non-conformance handling

4. Process and Production Control

  • Standard operating procedures for key processes
  • In-process quality control (IPQC) with defined checkpoints
  • Production planning and order execution tracking
  • Machine maintenance program with scheduled servicing

5. In-House Lab Testing

  • Lab or testing capability relevant to the product
  • Calibrated test equipment with current calibration records
  • Documented test methods and acceptance criteria
  • Test records retained and linked to production batches

6. Final Inspection

  • Final quality control (FQC) with defined AQL sampling
  • Defect classification and disposition procedure
  • Inspection records and shipment release controls
  • Clear segregation of accepted and rejected goods

7. People Resources and Training

  • Documented training program for quality and production staff
  • Competency records for inspectors and key personnel
  • Adequate staffing and manpower for the production volume
  • Regular refresher training on quality procedures

Critical Control Points

FCCA includes critical control points that must all be met regardless of the overall percentage. A factory that scores zero on any critical question is rated C-Unacceptable until corrections are completed and validated by the third-party auditor. Meeting every critical point is therefore as important as the total score.

Pass Score, Rating, and CAP

The overall score must reach at least 70%, with all critical control points met, to pass. The rating guide is A (90-100%, Good), B (70-89%, Acceptable), and C (below 69%, Unacceptable). Where non-compliances or scores of 0 or 1 appear in critical or safety areas, the factory must complete a Corrective Action Plan and send it to the third-party office within 90 days of the audit date.

FAQ: FCCA Requirements Frequently Asked Questions

The following questions are optimized to capture "People Also Ask" results in search engines.

Q: What are FCCA's seven modules?

A: The seven FCCA modules are Factory Facility & Environment; Quality Management System; Incoming Material Quality Control; Process and Production Control; In-House Lab Testing; Final Inspection; and People Resources and Training.

Q: What is the FCCA pass score?

A: A factory must achieve at least 70% overall, with all critical control points met. Results are rated A (90-100%), B (70-89%), or C (below 69%).

Q: What are FCCA critical control points?

A: Critical control points are high-risk checkpoints that must all be met. A zero score on a critical question results in a C-Unacceptable rating until the issue is corrected and validated by the third-party auditor.

Q: Does FCCA require ISO 9001?

A: ISO 9001 is not strictly mandated, but a documented Quality Management System aligned to ISO 9001 is the recognized benchmark and supports a strong FCCA result. The factory cited in Walmart's sample FCCA report was ISO 9001:2015 certified.

Q: How long is the FCCA CAP window?

A: The completed Corrective Action Plan must be sent to the third-party office no more than 90 days after the audit date. Missing this deadline can make the factory Inactive for Walmart purchase orders.

Conclusion

FCCA readiness comes from running a real quality system every day, not from last-minute fixes. Work through the seven-module checklist, protect every critical control point, and keep your CAP clock under 90 days. Factories that treat FCCA as a continuous discipline pass with confidence and keep Walmart orders flowing.

Get Free FCCA Readiness Check

References

  1. Walmart. Factory Capability & Capacity Assessment (FCCA) — assessment report criteria, seven modules, pass score 70%+, critical control points, and CAP within 90 days.

Tag
Contact Us

TRANWIN MANAGEMENT CONSULTING CO.,LTD.


CONTACT: Mr. David Lee

E-MAIL: chaowang@tranwin.net(prefered)

MOBILE:18601633226

TEL: 0086-21-51029391 

WECHAT: LISHUNDAO

ADD: No. 655 Yinxiang Road, Nanxiang Town, Jiading District, Shanghai


ASIAN OFFICES

Hanoi Office, Vietnam

Ho Chi Minh Office, Vietnam

Cambodia Office

Thailand Office

Malaysia Office

The Leading Factory Audit Consulting Company from China to Asia